Commercial diving equipment

2024-09-25

The 120 meter saturation diving system is mainly used for diving salvage operation and diving disease rescue and treatment. With modular design, it can be quickly loaded and disassembled on any ship.





Basic introduction

technical parameter

Diving saturation chamber

Working pressure of decompression chamber: ≥ 1.2MPa (120m)

Diving Bell

Working pressure of Diving Bell: ≥ 1.2MPa (120m)

Central control room (saturation cabin console, bell console, hanging console, etc.)

Capacity of decompression chamber: 4

Life support system

Diving Bell capacity: 3

Environmental control system

Cabin + frame: 7000 * 3000 * 3200mm

Hoisting system (console, hanger, winch, guide ballast, etc.)

Plate type frame steel structure: 6800 * 3000 * 3000mm

Underwater acoustic system

Gantry: 9000 * 4600 * 6000mm (3 parts can be separated)

Diving heating system

Diving Bell: φ 2500 * 3600mm

Guide ballast: 3200 * 2500 * 2000mm


Equipment container: 6058 * 2438 * 2591mm